Tuckshop
DESCRIPTION
Tuckshop renovation
Project Cost
$300k

School renovations. Refurbishment of existing 1960's tuckshop has been turned into a very functional and hi speed service canteen with self serve access and a modern look.

The front entrance and courtyard has been built using a curved wall with traditional dry pressed bricks to blend with the existing schools facade and capture the size of the entrance maximizing street appeal.

Tuckshop
No items found.